780.440.1723 6405 75 Street NW, Edmonton
Mach 6 Heavy-Duty
Inspection documentation being completed at Mach 6 in Edmonton
Confirmed capability

NDT, coordinatedwith your yearly inspection.

Non-destructive testing is coordinated through certified sublet partners — not performed in-house. We schedule it alongside your CVIP so it's one visit, not two.

48 hrs
Inspection results, from the unit landing in the bay
24 hrs
Written estimate, parts and labour broken out
40,000 sq. ft.
Edmonton facility with overhead cranes

Proof of capability

Capability you can check before you commit

Mach 6 is an authorized CVIP inspection station and Sennebogen's authorized service provider, working out of a 40,000 sq. ft. Edmonton facility with overhead cranes, a dedicated heavy-duty alignment bay and the diagnostic tooling to confirm a fault instead of guessing at it.

SennebogenAuthorized
service provider
BOSS Air/PowerDistributor
Certificate of Recognition (COR)
Alberta Construction Safety Association

Authorizations, distributor lines and safety certifications Mach 6 holds

What Mach 6 handles

NDT Inspections at Mach 6

  • NDT scheduled through certified sublet partners
  • Normally arranged alongside a CVIP or other annual inspection
  • One point of contact for the inspection and any resulting repair
  • Findings folded into the same repair plan as the rest of the inspection
  • Documentation kept together for your compliance file
Service advisor and technicians coordinating inspection scheduling

How the process works

Four steps, same order, every time

Same sequence whether it's one unit or a fleet program — that's what makes the 48-hour and 24-hour commitments something we can actually hold.

  1. Book the slot

    Give us the unit and the plate. We schedule around your run, not the other way round.

  2. Inspect to the checklist

    Same checklist, every unit, every time. Findings photographed as they're written up.

  3. Results inside 48 hours

    You get the inspection outcome and any repair plan within 48 hours of the unit landing in the bay.

  4. Repair and certify

    Approved repairs done in-house, then re-inspected and documented so the paperwork holds up.

Every job leaves here with a record: what was inspected, what was found, what was approved and what was done. That record is what turns a repair into a maintenance history you can plan against.
Mach 6 process commitment
Placeholder — needs client inputCustomer proof. The Website Plan calls for a customer-outcome block on every commercial page. No named customer references, testimonials or case results appear in the supplied documents, so nothing has been invented. Supply an approved quote with permission to publish and it drops into this block.
Do you perform NDT in-house?

No. NDT is coordinated and sublet to certified partners. We're straight about that because the certification is what makes the result worth having.

Why book it through Mach 6 then?

Because it lands in the same visit as the CVIP and the repairs, with one schedule and one set of paperwork instead of three.

Get it booked

Tell us what's down.
We'll tell you when it's back.

Inspection results in 48 hours. Estimates in 24 hours. Both start the moment the unit lands in the bay.

780.440.1723
Fastest route if the unit is already down
6405 75 Street NW
Edmonton, AB T6E 0T3