780.440.1723 6405 75 Street NW, Edmonton
Mach 6 Heavy-Duty
Technician carrying out a systems inspection at Mach 6
Priority service

Propane systems,inspected and leak tested.

Inspection, leak testing and repair of propane systems on commercial vehicles and fleet units.

48 hrs
Inspection results, from the unit landing in the bay
24 hrs
Written estimate, parts and labour broken out
40,000 sq. ft.
Edmonton facility with overhead cranes

Proof of capability

Capability you can check before you commit

Mach 6 is an authorized CVIP inspection station and Sennebogen's authorized service provider, working out of a 40,000 sq. ft. Edmonton facility with overhead cranes, a dedicated heavy-duty alignment bay and the diagnostic tooling to confirm a fault instead of guessing at it.

SennebogenAuthorized
service provider
BOSS Air/PowerDistributor
Certificate of Recognition (COR)
Alberta Construction Safety Association

Authorizations, distributor lines and safety certifications Mach 6 holds

What Mach 6 handles

Propane System Inspection at Mach 6

  • Propane system inspection on commercial vehicles and fleet units
  • Leak testing
  • Component repair and replacement
  • Findings documented alongside your other inspection records
  • Scheduled with a CVIP or PM visit where that suits the unit
Under-vehicle systems inspection at the Mach 6 facility

How the process works

Four steps, same order, every time

Same sequence whether it's one unit or a fleet program — that's what makes the 48-hour and 24-hour commitments something we can actually hold.

  1. Book the slot

    Give us the unit and the plate. We schedule around your run, not the other way round.

  2. Inspect to the checklist

    Same checklist, every unit, every time. Findings photographed as they're written up.

  3. Results inside 48 hours

    You get the inspection outcome and any repair plan within 48 hours of the unit landing in the bay.

  4. Repair and certify

    Approved repairs done in-house, then re-inspected and documented so the paperwork holds up.

Every job leaves here with a record: what was inspected, what was found, what was approved and what was done. That record is what turns a repair into a maintenance history you can plan against.
Mach 6 process commitment
Placeholder — needs client inputCustomer proof. The Website Plan calls for a customer-outcome block on every commercial page. No named customer references, testimonials or case results appear in the supplied documents, so nothing has been invented. Supply an approved quote with permission to publish and it drops into this block.
Can this be done with a CVIP?

Yes — combining it with an inspection or PM visit is usually the efficient way to schedule it.

Get it booked

Tell us what's down.
We'll tell you when it's back.

Inspection results in 48 hours. Estimates in 24 hours. Both start the moment the unit lands in the bay.

780.440.1723
Fastest route if the unit is already down
6405 75 Street NW
Edmonton, AB T6E 0T3